Stone Lake Drive Community Park
Stone Lake Drive Community Park has a real civic story behind it — a small neighbourhood park that became the centre of a genuine community debate over how Nanoose Bay should build its next playground.

The Natural Playground Debate
When the playground infrastructure at Nanoose Community Park was dismantled in 2017 over safety concerns, residents asked the Regional District of Nanaimo to find a new site for a natural playground — one built from logs, boulders, and landscaping rather than manufactured equipment. RDN staff studied several candidate sites, including Claudet Road Community Park, before settling on Stone Lake Drive: at 2.96 acres, with existing trails, fenced retention ponds installed by the original developer, a park entry sign, and RDN water service already on site.
The choice wasn’t without controversy. A petition signed by 32 residents pushed back, wanting the site “to remain in its state without the trees, shrubs, and other natural growth removed to construct a playground,” and asking the RDN to build at Claudet Road instead. The regional district moved ahead with Stone Lake Drive regardless, and the natural play space project went forward — a genuine example of local democracy in action, disagreements and all.
From Approval to Construction
The idea itself traces back to a June 2017 delegation to the Nanoose Bay Parks and Open Spaces Advisory Committee, requesting natural play features for the Madrona/Timberstone Estates neighbourhood specifically. The RDN Board approved Stone Lake Drive as a pilot project that October.
The eventual concept plan carried an estimated construction cost of $45,000, funded through the Community Works Fund, with ongoing annual costs projected at roughly $1,300 for garbage service and $500 for maintenance and repairs. By October 2019, the RDN was ready to move to design and construction, issuing a Design Build Proposal call to qualified firms and holding a public information session at the park itself — drawing around 35 attendees on a late October afternoon.
What’s there today reflects that natural-play philosophy directly: regenerating forest, several stormwater detention ponds, and easy walking trails that loop around them — playground elements built from the landscape itself rather than imported equipment, exactly as the original 2017 request intended.
Last updated:
← Back to All the Stories | All community parks & trails | View on the map →
